To download a PDF version of these assembly instructions please click on the file below.
shelving assembly instructions
Step 1
|
Step 2
|
Insert base legs into uprights to make L shape for wall shelving or T shape for gondola shelving. To insert the base legs, locate the two upper lugs into the upright and rotate downwards to locate the lower lug, use a rubber mallet to tap the base leg into position |
Hold two uprights the appropriate distance apart and insert a back panel into both uprights. The back panel should locate into the inside slot of each upright. The shelving should be levelled at this point using the adjustable feet. |
Step 3
|
Step 4
|
Attach the kick panel to the base feet using the slots in a similar fashion to the back panel. |
Place base shelf onto base legs and then complete adding the back panels. If small back panels are used, put these on first. |
Step 5
|
Step 6
|
Once all the backpanels are fitted, you are ready to add the shelves |
The brackets should be positioned in the H slot of the upright and should be located in the inside slot (the back panel and bracket for the next shelving bay will use the other slot). The 3 hook brackets can be horizontal or tilted upwards or downwards as required. |
Step 7
|
Step 8
|
Repeat step 6 with the required number of brackets and then lower the correct size shelf onto the brackets. |
Finally add any shelf ticket strips, risers and dividers. |
To download a PDF version of these assembly instructions please click on the file below.


January 30, 2012Read more...
December 12, 2011Read more...
December 9, 2011Read more...
November 21, 2011Read more...
November 18, 2011Read more...
